Long before the first machine arrives, the foundation drawing is already on your desk, and that order is the whole point. We use it to set the level baseline, route cooling water and air, and fix where the finishing end can stack pipe. This timeline walks the stages in strip order: drawing review, plinths, erection, tie-ins, the first real coil, then training and a documented handover. We publish the sequence and the integral scope, but no duration, team size or consumption figure. Those are to be confirmed in writing. One caveat: the neatest schedule on paper still fails if the utilities are not ready when the welder arrives.